NAVTTC Third-Party Monitoring & Evaluation

Nexskill Karachi

Blended International IT Trainings 2026 โ€“ Package 9. Audit of institute operations, training delivery, attendance verification, infrastructure adequacy, and student satisfaction.

Visit date: 15 September 2026  ยท  District: Karachi Korangi, Sindh  ยท  Program: NAVTTC NSIS Portal

3
Trades
5
Batches
130
Enrolled
83
Present at Visit
55
Computers
4
Trainers

Institute Profile

General information and operational baseline captured during the third-party monitoring visit.

Identity & Location

Institute IDโ€”
Institute Nameโ€”
Addressโ€”
District / Regionโ€”
Provinceโ€”
Programโ€”
Visit Dateโ€”

Contacts

Principal / Focal Personโ€”
Principal Phoneโ€”
Monitoring Officerโ€”
Monitoring Officer Phoneโ€”

Operations

Total Trades Assignedโ€”
Total Batchesโ€”
Enrolled Studentsโ€”
Capacity per Slotโ€”

Trades & Batches

Three IBM-certified trades running across five batches. Click any card to view batch-level attendance, trainer assignment, and delivery mix.

Instructor Profiles

Four trainers assigned across the three trades. Three are registered on the NAVTTC PMS Portal; one delivers training without PMS registration.

TrainerTradeQualificationExperienceContactPMS Portal

Infrastructure & Facilities

Physical setup, utilities, safety equipment, and digital monitoring infrastructure verified during the visit.

Teaching-Learning Material (TLM) Provisioning

Material Status

Course Materials / TLMsโ€”
Consumable Materialโ€”
Tools & Equipmentโ€”
Multimediaโ€”

Attendance & Monitoring

Biometric AttendanceYes
Biometric Cardsโ€”
CCTVInstalled & Functional
PMS Daily SyncYes
NAVTTC Mobile AppShared

Key Findings

Triaged by severity: green for compliant, amber for gaps requiring monitoring, red for non-conformities requiring NAVTTC attention.

โœ“ Compliant

    โš  Gaps

      โœ• Non-Conformities

        Computer Inventory

        55 training computers across the institute โ€” split between HP Z600 Xeon workstations (high-spec) and Dell/HP/Lenovo 6th/7th Gen desktops.

        Source: NAVTTC Third-Party Monitoring & Evaluation Report โ€” Institute ID 16053, Nexskill Karachi. Visit date 15 September 2026. Monitoring Officer: Sajid Anwar.

        Data extraction: All findings, attendance figures, instructor profiles, and infrastructure checks transcribed from the official NAVTTC monitoring checklist. Triage colours assigned by the report analyst based on NAVTTC compliance expectations.

        Scope: This is a third-party audit of one institute, not a NAVTTC-wide regulatory framework. For NAVTTC framework-level reference, see the broader monitoring standards.